Integrated Trade Execution for Commercial & Multi-Family Construction

Fire, electrical, and data infrastructure delivered through one coordinated managementstructure built to protect project schedules and reduce trade friction.

Solution
500+
Commercial & multi-scope installations completed
01 / About Us

Built for Coordinated Infrastructure Delivery

Our approach eliminates fragmentation and protects schedule integrity on commercial andmulti-family developments

Commercial
Integrated
Disciplined
10+
Years
3
One System
100%
Inspection-Ready

FED Construction integrates fire, electrical, and data systems under one project management structure. We reduce scope gaps, sequencing conflicts, and inspection delays by aligning critical trades before and during construction

Rocket Icon

One coordinated management structure across fire, electrical, and data, ensuring sequencing clarity and scope alignment from day one.

Map Icon

Documentation, installation standards, and execution built to pass inspections without rework or delay.

Farm Icon

Design participation, scope alignment, and sequencing planning that reduce downstream conflicts and change orders.

Top Right Icon

Clear ownership across disciplines. No scope gaps. No cross-trade ambiguity.

02 / Our Soutions

Integrated Infrastructure Systems

Fire Systems

Fire system infrastructure delivered through disciplined coordination with electrical and low-voltage systems. Inspection-ready documentation. Integrated sequencing.

Arrow Right

Electrical Infrastructure

Power distribution, tenant build-outs, and ground-up electrical infrastructure delivered withsequencing clarity and schedule discipline.

Arrow Right

Data & Low Voltage

Structured cabling, access control, surveillance, and integrated network infrastructure alignedwith electrical and life safety systems.

Arrow Right
03 / Why FED

What’s our solutions?

01.

One Integrated Trade Partner

Fire, electrical, and data delivered under one coordinated management structure.

02.

Schedule Protection Built In

We align trades before work begins, reducing sequencing conflicts & inspection delays.

03.

Unified Project Oversight

A single leadership structure oversees all disciplines, ensuring execution stays coordinated.

04.

Inspection-Ready Execution

Our documentation, installation standards, and field discipline are built to pass inspection without scrambling.

05.

Reduced Change Order Risk

Clear scope delineation and early integration eliminate cross-trade ambiguity—lowering rework exposure.

Rocket Icon
20%
Large construction projects take 20% longer to finish than scheduled on average.
Tractor Icon
30%
Over 30% of project time is lost due to coordination inefficiencies between trades.
Map Icon
5–10%
Rework accounts for up to 5–10% of total project cost.
Rocket Icon
70%
Nearly 70% of construction projects experience schedule overruns.
Tractor Icon
15%
Poor planning and sequencing are among the top three causes of delay on commercial builds.
Map Icon
10–20%
Change orders can increase project timelines by 10–20%.
Rocket Icon
1%
Construction productivity has grown less than 1% annually over the past two decades.
Tractor Icon
48%
Miscommunication is responsible for up to 48% of project rework.
Map Icon
15%
Teams with centralized oversight report up to 15% higher project efficiency.
Rocket Icon
1 mth
Inspection failures can delay project milestones by weeks or months.
Tractor Icon
7%
Rework due to non-compliance accounts for nearly 7% of total project value globally.
Map Icon
15%
Documentation errors are among the top contributors to inspection delays.
Rocket Icon
15%
Change orders can account for 5–15% of total project cost.
Tractor Icon
58%
Scope gaps are one of the leading drivers of post-award budget increases.
Map Icon
25%
Projects with early trade integration report significantly fewer scope-related disputes.
05 / FAQ's

Frequently Asked Questions

Do you self-perform all scopes?

We self-perform electrical and data systems and manage fire systems through integratedproject oversight to ensure unified coordination.

Do you work directly with developers?

We primarily contract under General Contractors while supporting developers through pre-construction integration and schedule alignment.

Can you participate during design phase?

Yes. Early coordination reduces downstream delays and improves inspection outcomes.

What size projects do you focus on?

Commercial and multi-family projects where integrated trade coordination protects scheduleperformance.

How does AI biotechnology in agriculture compare to conventional farming methods?

Conventional farming relies heavily on manual observation, routine chemical use, and historical experience. AI biotechnology replaces guesswork with real-time data and genetic precision. Farmers can predict outcomes, minimize inputs, and increase yield sustainably — creating a more resilient and data-driven agricultural ecosystem.

If your project requires electrical, fire, and data systems  delivered without cross-tradefriction  FED Construction is built to execute.